





BUILD PROJECT: DP-08
Craig Loomes Design boasting quality and sleak lines. The construction is well underway by Profab Central Engineering Ltd based in Palmerston North. The interior will be designed by Chris Connell and no expense spared in the engine room, with 2 Caterpillar C18 A Rated to 587hp engines to cruise 13 knots.
The Build Process
The Flip...
The superstructure is rapidly taking shape, and even though the hull look pretty much the same as before, it's all in the small details! Photos taken by John on May 27th, 20009.
Click here to see the latest web camera photos, at the prompt enter user name 'diverse', password 'black': CAMERA ONE & CAMERA TWO (opens in a new window)
Updated picture of the hull.










